Project Description
According to the plans made in order to operate the rehabilitation and steel factories and the construction of a 450 MW combined cycle power plant and consequently the need to increase the level of energy exchange with the national electricity network, and to achieve the drawn horizon, IPJC managed to establish the following complex with the construction of a 230kV dual-circuit power transmission line with a length of 6 km and the development of a 230kV Malayer switchboard (two complete one-and-a-half switches) and eventually was appeared as an elevated EPC in 2019.